Benchmarks / DeckBench / Kestrel Logistics

Measured by Spring Prompt

Gemini 3.8 Flash: On-time delivery: what is going wrong and what to fund

For the board and the company's three main investors. The decision it supports: whether to fund 40 more drivers or a trunk re-plan with 10 drivers.

Verdict
Not presentable
Deck rating
771
Slides
6 (brief: 5-8)
Design quality
58%

Why it is not presentable

  • Layout defect: something off the slide, colliding, too small or too faint to read
  • Did not give the analysis's recommendation within the first two slides
  • Made a material claim the analysis does not support
  • A slide the judges rated as needing work

In detail

  • Slide 5: “Structural issues remain confined to Stoke and Doncaster trunking lines.” is not supported by the analysis.
  • Slide 2: 3 body text boxes set at 11 pt, too small to read
  • Slide 2: Text too faint against its background (contrast 1.9:1)
  • Slide 4: Text too faint against its background (contrast 1.9:1)
  • Slide 5: Text too faint against its background (contrast 1.9:1) (2 times)
  1. Slide 1 of Gemini 3.8 Flash's deck
    Slide 1Download slide imagePolished
  2. Slide 2 of Gemini 3.8 Flash's deck
    Slide 2Download slide imageNeeds work Supporting text in the left and right KPI cards extends below the cards' bottom borders.The first KPI card's caption ('Below 93.0% floor with 2 largest customers') wraps onto a second line that spills past the bottom edge of its box.
  3. Slide 3 of Gemini 3.8 Flash's deck
    Slide 3Download slide imagePolished
  4. Slide 4 of Gemini 3.8 Flash's deck
    Slide 4Download slide imageAcceptable The title names the comparison rather than stating the recommendation or financial takeaway.The title is a topic label; the takeaway sits in the subtitle instead.
  5. Slide 5 of Gemini 3.8 Flash's deck
    Slide 5Download slide imageAcceptable The broad title and two separate caveats do not establish one immediate takeaway.Both boxes leave roughly the bottom 40% empty, which wastes space and unbalances the slide.
  6. Slide 6 of Gemini 3.8 Flash's deck
    Slide 6Download slide imageAcceptable The generic title misses an opportunity to state the funding decision directly.The title is a topic label ('Recommendation & Next Steps') rather than a statement of the decision.