Benchmarks / DeckBench / Northgate Homes

Measured by Spring Prompt

GPT-6 Sol: Responsive repairs: in-house team or renewed contract

For the board of trustees of a housing association, including two tenant board members. The decision it supports: whether to approve £1.2m to set up an in-house repairs team or renew the contract.

Verdict
Presentable
Deck rating
1,438
Slides
7 (brief: 6-9)
Design quality
93%
  1. Slide 1 of GPT-6 Sol's deck
    Slide 1Download slide imagePolished
  2. Slide 2 of GPT-6 Sol's deck
    Slide 2Download slide imagePolished
  3. Slide 3 of GPT-6 Sol's deck
    Slide 3Download slide imagePolished
  4. Slide 4 of GPT-6 Sol's deck
    Slide 4Download slide imagePolished
  5. Slide 5 of GPT-6 Sol's deck
    Slide 5Download slide imagePolished
  6. Slide 6 of GPT-6 Sol's deck
    Slide 6Download slide imageAcceptable A large empty band separates the compact table from the callout boxes, making the layout feel disconnected.Large empty gap between the table and the callout boxes leaves the layout unbalanced.
  7. Slide 7 of GPT-6 Sol's deck
    Slide 7Download slide imagePolished